RORK LABJP
DEADLINE — From August 31, 2026, Google Play requires target API level 36 (Android 16) or higher for both new apps and updates to existing ones. Twelve days leftEXTENSION — If you cannot make the date, the deadline extension form in Play Console buys you until November 1. The extension is not automatic, so the request itself has to land before August 31TARGET SDK — Even for the Expo and React Native apps Rork produces, the targetSdkVersion is yours to verify. A template pinned to an older SDK will not meet the requirement on its ownRORK MAX — Where the original Rork emits React Native and Expo, Rork Max generates native Swift, covering iPhone, iPad, Apple Watch, Apple TV, Vision Pro, and iMessageFUNDING — A $15M seed round led by Left Lane Capital was announced on April 9, alongside the acquisition of app builder Paperline to bring in engineering talentiOS — Developer beta 6 of iOS 27 arrived on August 17 with the autumn release drawing closer. If you ship native Swift output, the new OS timeline feeds straight into your release planDEADLINE — From August 31, 2026, Google Play requires target API level 36 (Android 16) or higher for both new apps and updates to existing ones. Twelve days leftEXTENSION — If you cannot make the date, the deadline extension form in Play Console buys you until November 1. The extension is not automatic, so the request itself has to land before August 31TARGET SDK — Even for the Expo and React Native apps Rork produces, the targetSdkVersion is yours to verify. A template pinned to an older SDK will not meet the requirement on its ownRORK MAX — Where the original Rork emits React Native and Expo, Rork Max generates native Swift, covering iPhone, iPad, Apple Watch, Apple TV, Vision Pro, and iMessageFUNDING — A $15M seed round led by Left Lane Capital was announced on April 9, alongside the acquisition of app builder Paperline to bring in engineering talentiOS — Developer beta 6 of iOS 27 arrived on August 17 with the autumn release drawing closer. If you ship native Swift output, the new OS timeline feeds straight into your release plan
TAG

Maestro

2 articles
Back to all tags
Related:
rork-max1e2e-testing1detox1ci-cd1flaky-test1quality-assurance1E2E Testing1CI1React Native1Rork1
Rork Dev/2026-07-13Advanced

Your Detox and Maestro E2E Suite Was All Green — but the Retries Were Hiding a Flaky Test That Crashed in Production

Your E2E suite is green, yet production still crashes. The culprit: auto-retries quietly swallowing flaky failures. Field notes on measuring per-test flake rate, quarantining, and keeping only real failures as release gates.

Rork Dev/2026-06-19Intermediate

Before You Burn Out Hand-Testing Every Release: Automate Your Rork App's Critical Flows with Maestro

With Rork, a prompt that fixes one screen can quietly break another. Here is how I automate the revenue-critical path from launch to paywall using Maestro and run it in CI, including the spots where I got stuck as an indie developer.