●EXPO — EAS Observe now records native crashes (Oct 7). On SDK 57, update to 57.0.21 or later●RORK — GPT-6.1 Sol (Sep 29) and Claude Sonnet 5.5 (Sep 28) are now in the model menu●RN 0.88 — The stable release was still unpublished on its Oct 12 target. rc.4 (Oct 7) is the newest; 0.87.1 is Latest●Q&A — Readers report expo-widgets showing a black widget in production builds only●WINDOWS — A walkthrough shows how to ship an iPhone app from Windows only, with no Mac●NEW — Three checks to run first when notifications stop arriving in Expo Go●EXPO — EAS Observe now records native crashes (Oct 7). On SDK 57, update to 57.0.21 or later●RORK — GPT-6.1 Sol (Sep 29) and Claude Sonnet 5.5 (Sep 28) are now in the model menu●RN 0.88 — The stable release was still unpublished on its Oct 12 target. rc.4 (Oct 7) is the newest; 0.87.1 is Latest●Q&A — Readers report expo-widgets showing a black widget in production builds only●WINDOWS — A walkthrough shows how to ship an iPhone app from Windows only, with no Mac●NEW — Three checks to run first when notifications stop arriving in Expo Go
Articles/Getting Started
◈ Getting Started/2026-10-12Beginner

Before You Promise "Release in a Week" — Break Down the Days You Will Spend Waiting

When your Rork app is ready, the release date still isn't yours to set. Break the wait into Apple enrollment, Google Play closed testing, and first review, then work out the earliest and the late-case date with a small TypeScript script.

Rork578Release5Google Play36App Store90App Review4Planning

I was writing an update note for one of my wallpaper apps when I stalled on the date field. The work itself was two days from done. Even so, I couldn't make myself type "next week."

I saved the note with the date left blank. That was the night I realized the waiting had never been part of my estimate, because none of it was in my hands.

Once a Rork app takes shape, it's easy to feel that the only thing left is to ship. For a first release, though, the waiting often takes longer than the building.

The thing I'd like to say up front is that "release in a week" holds only when several conditions line up. Below, I break the waiting into pieces so you can work out your own date.

Four kinds of waiting

Saying "review takes a while" hides where the days actually go. I count four separate waits.

WaitWhose handsHow I estimate it
Apple Developer enrollment approvalApple (varies for individual vs. organization)A range of a few days; longer for organizations
Google Play closed testingYours (gathering testers) and the calendar (consecutive days)Personal accounts have a required tester count and number of consecutive days in Google's help pages
First App Store reviewAppleOften short, but I budget a rejection separately
First Google Play reviewGoogleFor a new account, I assume it runs longer than usual

These numbers shift with the season and the state of your account. That's why the table names whose hands the wait is in rather than promising days. Please confirm the actual figures in the official help pages on the day you plan.

The 14 days people miss

If you're building as an individual, this is where I think estimates go wrong most often. Before production access, a personal developer account has to run a closed test with a required number of testers for a required number of consecutive days. As far as I know that's 12 testers for 14 consecutive days, but please check the current figures.

The clock starts only after all the testers are in. So the estimate shouldn't be 14 days. It should include:

  • the days it takes to gather testers (the most variable part)
  • the consecutive days after that
  • some slack for someone dropping out

How fast people sign up is not something I control. I write that step as a range — "three days to three weeks."

A script that works the date backward

Adding these up by hand each time is how I ended up frozen at the date field. Put the minimum and maximum of each wait into the script below, and it lays out both paths, iOS and Android, side by side.

// release-eta.ts
// Purpose: work backward from wait ranges to an earliest date and a late-case date
// Run: npx tsx release-eta.ts
// Every number is my own assumption, not an official guarantee. Check and overwrite them.
 
type Wait = { label: string; min: number; max: number }; // calendar days, not business days
 
const DAY = 86_400_000;
const addDays = (d: Date, n: number) => new Date(d.getTime() + n * DAY);
const fmt = (d: Date) => d.toISOString().slice(0, 10); // UTC, so it may be off by a day
 
function eta(start: Date, steps: Wait[], rejectBuffer = 0) {
  const sum = (k: "min" | "max") => steps.reduce((a, s) => a + s[k], 0);
  return {
    earliest: addDays(start, sum("min")),
    latest: addDays(start, sum("max") + rejectBuffer),
  };
}
 
const start = new Date("2026-10-13"); // the day you begin (today is fine)
 
// iOS path: enrollment approval -> review
const ios = eta(start, [
  { label: "Apple Developer enrollment", min: 1, max: 7 },
  { label: "First App Store review", min: 1, max: 4 },
], 3); // resubmission time if rejected once
 
// Android path: gather testers -> consecutive days -> review
const android = eta(start, [
  { label: "Gather testers", min: 3, max: 21 },
  { label: "Closed-test consecutive days", min: 14, max: 14 },
  { label: "First Google Play review", min: 2, max: 7 },
], 3);
 
console.log("iOS     earliest:", fmt(ios.earliest), " late case:", fmt(ios.latest));
console.log("Android earliest:", fmt(android.earliest), " late case:", fmt(android.latest));
 
// If you ship both, the slower path decides the date
const both = new Date(Math.max(ios.latest.getTime(), android.latest.getTime()));
console.log("Both ready (late case):", fmt(both));

Starting on October 13, 2026 with these assumptions, the Android path becomes the heavy one: 19 days at the earliest, and 45 days — more than six weeks — in the late case.

What helps more than the numbers is seeing which path is setting the date. Before you write "a week," look at that output once.

Phrasing that makes the promise lighter

A longer estimate isn't something to be discouraged by. Changing how you say it makes the promise much lighter.

  • Say "rolling out from the second week of the month," not a single date
  • Give iOS and Android separate dates instead of insisting on both at once
  • Use the waiting days to move forward on what's in your own hands, such as screenshots and store text

How to control the moment of release itself is covered in another piece (If you can't predict when review ends, decide the release date outside the review queue). That one is about choosing the moment; this one is about knowing when you can get there.

Some values can't be changed later, and the bundle ID is one of them — best settled before the waiting starts. The post on deciding your app ID before the first release pairs well with this one.

Put the date after the other side's waiting

Since the night I stalled at the date field, one rule has changed.

Put the promised date after the other side's waiting has been added, not after my own working days.

These days I pick the date in announcements from the late-case column. If I ship earlier, I get to be pleasantly surprised.

For your first task tomorrow, put your start date and the figures you confirmed in the help pages into the script and run it once. Notice how far the result lands from your current "one week." Starting from that gap is enough.

Share

Thank You for Reading

Rork Lab is ad-free, supported entirely by members like you. We publish practical guides daily with implementation code, benchmarks, and production-ready patterns. If you've found it useful, we'd love to have you on board.

  • ✦Copy-paste ready implementation code
  • ✦New advanced guides published daily
  • ✦$5/mo or $15 for lifetime access
View Membership →

If you found this article helpful, a small tip ($1.50) would mean a lot to us. Your support helps keep this site ad-free and covers server and hosting costs.

Related Articles

◈ Getting Started2026-08-19
You Cannot Shorten Review, But You Can Still Choose the Moment Your App Goes Live
Review time is out of your hands. The moment your app appears in the store is not. Here is how the three App Store Connect release options, Google Play managed publishing, and eas submit fit together.
◈ Getting Started2026-08-22
The names you can change, and the ones you can't — the 30 minutes before your first Rork release
An app has three names, and only the display name can be changed after release. Here is how I check the identifiers Rork fills in by default, using a dependency-free script, before I hit submit.
◈ Getting Started2026-08-30
expo-doctor passes on API level 35. Here is what its 22 checks actually cover
I opened the expo-doctor 1.20.4 bundle and listed every check it registers. Only one looks at store requirements, and its threshold is still API level 34.
📚RECOMMENDED BOOKS
Build a Large Language Model (From Scratch)
Sebastian Raschka
LLM Dev
Prompt Engineering for LLMs
Berryman & Ziegler
Prompting
AI Engineering
Chip Huyen
AI Eng
* Contains affiliate links